Zero Water Capable
Home is plumbed and equipped to operate without municipal water inputs (rainwater + greywater + on-site treatment).
Description
The Zero Water Capable badge recognizes homes that are plumbed, treated, and equipped to operate without any municipal water input — drinking, bathing, and irrigation all met by on-site sources (rainwater catchment, greywater reuse, and where applicable on-site groundwater) with appropriate treatment.
"Capable" rather than "Certified" is intentional: the home must demonstrably be able to run off-grid for water, but does not need to prove a 12-month period of zero municipal use. Many projects earning this badge maintain a municipal connection for redundancy or fire-suppression code reasons and operate primarily on captured water.
A related Home Water Score-based pathway exists in the GreenStar standard: achieving a Home Water Score of 10 earns the closely-related "Zero Water Certified" recognition through fixture and landscape efficiency alone (without requiring rainwater infrastructure). Zero Water Capable goes further by requiring the supply infrastructure itself.
Required standard requirements
To earn this badge, the project must meet all of the following existing GreenStar requirements:
Additional badge criteria
Beyond the required standard requirements above, the project must also satisfy:
On-site supply & treatment
- 01.
Rainwater catchment system sized to meet 100% of annual indoor potable demand based on local average annual rainfall, roof catchment area, and modeled household demand (occupants = bedrooms + 1, per the GHI Home Water Score convention).
- 02.
Potable treatment train rated for the captured supply: minimum first-flush diverter + sediment filter + carbon filter + UV disinfection + NSF/ANSI 53/55-certified components. Storage cistern food-grade or NSF 61 rated.
- 03.
Greywater system reusing bath/shower/laundry effluent for toilet flushing and/or sub-surface irrigation, designed per local code (typically Uniform Plumbing Code Chapter 16 or IAPMO 326).
- 04.
Backup pathway documented: either a properly disconnected municipal connection (with backflow prevention) or a documented well-water tie-in. Storage volume sized for at least 30 days of typical demand during dry periods.
Demand reduction
- 01.
Project must also achieve a Home Water Score ≥ 5 (Gold tier) — captured supply only works at meaningful scale once fixture demand is cut.
- 02.
No conventional flush toilets above 1.0 GPF. Composting or vacuum toilets count toward the demand reduction and are encouraged.
- 03.
Outdoor irrigation served exclusively by greywater, captured rainwater, or drought-adapted plantings with no supplemental irrigation.
Documentation
- 01.
Water-balance calculation showing annual supply (captured + reused) ≥ annual modeled demand, with 30-day reserve.
- 02.
Plumbing permit + sign-off from local AHJ for the rainwater and greywater systems.
- 03.
Water-quality test results from the potable supply at first occupancy: pH, turbidity, total coliform, E. coli, and (where applicable) lead and nitrate.
- 04.
Photos of the catchment surface, cistern, treatment skid, and greywater diverter / surge tank.
Verification by tier
Evidence the project team submits at each certification tier. Cumulative — higher tiers include everything below unless noted otherwise.
-
Certified
Self-attestation- 01.
Owner-signed water-balance worksheet: annual catchment volume vs annual modeled demand, with the 30-day reserve calculation.
- 02.
Photos of the catchment surface, cistern, treatment skid, and greywater diverter.
- 01.
-
Silver
Documents + photos- 01.
Plumbing permit + AHJ sign-off for the rainwater and greywater systems.
- 02.
Manufacturer cut sheets for storage cistern (NSF 61) and treatment-train components (NSF 53 / 55).
- 01.
-
Gold
Third-party test- 01.
Potable water-quality test from a state-licensed lab at first occupancy: pH, turbidity, total coliform, E. coli (and lead / nitrate where applicable).
- 02.
Third-party plumbing inspection of cross-connection isolation and backflow prevention.
- 01.
-
Platinum
Post-occupancy verification- 01.
12-month water meter log showing municipal supply use trending to zero (or documented disconnect from municipal supply with maintained reserve).
- 02.
Annual water-quality re-test for as long as the badge is claimed.
- 01.